Bruce Crabbs

  • BY admin
  • November 17, 2022

Bruce Crabbs

Mr. Crabbs has been applying his Instrumentation and Control knowledge since 1982 in design engineering and licensing services. For two years, Mr. Crabbs worked directly for an electric utility in the Instrumentation and Control organization. Since that time, Mr. Crabbs has been performing project and staff support activities on a contract basis. Mr. Crabbs’ most recent position with EXCEL Services provided project management of the Implementation Phase of the 24-Month Cycle Extension Project at the Fermi 2 Power Plant. This project includes surveillance procedure revisions, non-Technical Specification Surveillance Failure Analysis, Preventive Maintenance (PM) Event evaluation and justification for extension to a 24-month cycle, and other miscellaneous project activities to be addressed or performed for the implementation of the 24-month cycle extension of Fermi 2 Power Plant.