A plant’s conversion to the ISTS will support the plant in four major performance areas:
Standardizing a Fleet’s TS to the current revision of the ISTS NUREG will enhance the interface between the Engineering, Operations, Licensing and Technical Support Organizations within the Fleet. EXCEL’s support of ISTS clients in their ISTS conversion effort extends beyond the preparation and licensing of the plant’s ISTS. EXCEL has provided support to ISTS clients in the planning and scheduling of ISTS activities. EXCEL has provided Initial Training to all PWR and BWR ISTS clients and has developed the lesson plans and programs for, and is currently providing, licensed operator training for many of our clients.
EXCEL is also providing support in the development of programs and procedures to implement the ISTS and in the appropriate revisions to their Updated Final Safety Analyses Report. In addition, EXCEL’s experience in procedure upgrades related to Technical Specifications and ISTS affiliation with professionals extremely knowledgeable in procedure development and revision provide clients with complete ISTS conversion support.
EXCEL believes that, in order for the full benefit of the ISTS to be realized, an individual(s) who has detailed knowledge and experience with the ISTS and who developed the plant specific ISTS should participate in the procedure revision effort to ensure the procedures accurately reflect the requirements and benefits of the ISTS. This experience in ISTS conversion and implementation efforts will provide a nuclear utility with the confidence that the services performed by EXCEL will be based largely on experience and expertise at several similar plants. EXCEL has been successful in ensuring that a plant’s conversion to ISTS has still resulted in the plants being able to retain current licensing basis.
EXCEL’s support to ISTS clients in their ISTS line item improvements to their TS has ranged from providing technical input and support to developing the entire product. This full level of effort includes:
This level of effort by EXCEL ensures that the support of the utility is focused on the plant and engineering technical review of the product. This level of effort can be tailored to support a nuclear utility’s specific requirements.